Quote Builder · Guide
How to work out your workshop's overhead rate per hour
The short answer
Add up a year of the costs of keeping your workshop open, and divide by the hours you actually spend making, not every hour you work. Our example workshop costs £10,000 a year and its maker spends 1,196 hours making, so its overhead rate is £8.36 per making hour. Every quote then carries its hours × £8.36.
Please read: an estimate, not advice
This guide is general information only. Neville’s Numbers does not give tax or financial advice, and gives no assurance that a rate or price suits your business. Every figure here is simply an estimate for illustration; yours depends on your own costs, hours and market.
What an overhead rate is for
Some costs arrive with a job: the timber, the hinges, the courier. Others don't: the rent is the same whether you're building a wardrobe or waiting for a deposit. Those are your overheads. They still have to be paid, and the only money that pays them is what customers pay for their pieces.
The overhead rate shares those costs out fairly, so each quote carries its part. Leave it out and every job looks more profitable than it is, until the year-end figures show otherwise.
Step 1: List a year of workshop costs
Include anything you'd still pay in a month with no jobs on. Use last year's bank statements or invoices if you have them; a monthly figure × 12 is fine for anything regular.
| Workshop cost | Per year |
|---|---|
| Rent and business rates | £4,800 |
| Power and heating | £1,200 |
| Insurance | £600 |
| Tools, blades and machine upkeep | £1,200 |
| Van and fuel (the business share) | £1,500 |
| Phone, website, software and accountant | £400 |
| Consumables, workshop clothing, subscriptions | £300 |
| Total | £10,000 |
What to leave out
- Materials and hardware for a particular piece. They go on that piece's quote.
- Delivery or outside work for a particular job. Same again.
- Your own pay. That's a separate line in your hourly rate. See what to charge per hour.
- VAT you claim back, if you're VAT-registered. Enter those costs without VAT. If you're not registered, VAT is a real cost to you, so include it.
Machines and big tools
A new bandsaw is a cost of running the workshop, but it lasts for years. For pricing, spread it over the years you expect it to last: a £3,000 bandsaw kept for ten years adds £300 a year to your workshop costs. Do the same for each major machine, so that when one needs replacing, your prices have already paid for it.
Tax works differently. Most sole traders can deduct the full cost in the year they buy it, either as an expense under the cash basis or through the Annual Investment Allowance. That's about your tax bill. Spreading the cost is about pricing, and both can be true at once.
Step 2: Count your making hours
Count only the hours at the bench on paid work. Quoting, drawings, collecting timber, admin and sharpening are real work, but nobody is billed for them directly, so the making hours have to carry them.
If you're not sure of your split, note your hours for a fortnight and use that.
Step 3: Divide
That's the example workshop's overhead rate. A 40-hour dining table carries about £334 of workshop costs (40 × £8.36), on top of its materials and the maker's pay for the time.
Work out yours. The free Quote Builder does this from your own figures and shows the working. Nothing you type is saved.
Open the Quote BuilderTwo mistakes that undercharge
Dividing by every hour of the year
It's tempting to divide by a full working year: 52 weeks × 40 hours = 2,080 hours. That gives our example workshop a rate of £4.81 instead of £8.36.
| All hours | Making hours | |
|---|---|---|
| Hours used to divide | 2,080 | 1,196 |
| Overhead rate | £4.81 | £8.36 |
| Workshop costs on a 40-hour piece | £192 | £334 |
| Workshop costs recovered over the year | £5,750 | £10,000 |
The workshop is still only billed for 1,196 hours, so the lower rate recovers £5,750 of £10,000. The missing £4,250 comes out of the maker's pay.
A flat percentage on materials
Another shortcut is to add a fixed percentage, say 15%, to the materials. It ties the workshop's costs to the timber bill, but a workshop is used by time, not by timber. Take two commissions from our example workshop:
| Walnut table | Set of oak chairs | |
|---|---|---|
| Materials | £1,200 | £250 |
| Hours in the workshop | 30 | 60 |
| Workshop costs at 15% of materials | £180.00 | £37.50 |
| Workshop costs at £8.36 per hour | £250.80 | £501.60 |
On the percentage method the chairs carry £37.50 for 60 hours of rent, power and machine time, about 63p an hour. With a flat percentage, the pieces that take the most hours end up the most underpriced.
Keep it up to date
Work the rate out again when something big changes, such as a new lease, a van, or a change in how many days you make, and otherwise once or twice a year. Use your actual costs and hours from the past six or twelve months; the rate gets more accurate as your records build up.
Neville’s Numbers keeps this rate up to date for you. It works out your workshop's cost per hour from what you've actually spent and the hours you've actually logged, suggests the right share for every quote, charges it to every job, and lets you choose how each kind of cost is shared out: by hours, by material cost, or evenly across jobs.
Try the live demoSources
The workshop in this guide is an example with round figures, not a real business. This guide is general information, not tax or financial advice for your circumstances.